Showers · Floors · Walls · For DIYers

Tile work,
from the drain up.

The whole sequence for a job that lasts: layout you can plan on paper, waterproofing details, plumbing heights, a real material takeoff, and where to buy the right tile and membranes close to home.

“Planned the wall before I bought a single box. Four tiles left over, no second trip.”
Marcy T. · Guest bath, Portland OR
8
Phases, in order
3
Surface sequences
1/4"
The slope that matters
VALVE CENTER 42–48"NICHE + BLOCKINGFINISHED HEIGHTFIELD WIDTH — CENTERED ON VALVE1/4" / FT

The sequence

Eight phases, in the order they have to happen.

Skip one and the failure shows up months later, usually as a hollow tile or a stain on the ceiling below.

  1. 01

    Survey & plan

    Measure every wall, the drain center and the valve height. Decide where each grout line lands before anything is ordered.

  2. 02

    Demo & rough-in

    Strip to framing, replace the valve and drain, add blocking for grab bars and glass. Rough-in inspection happens here.

  3. 03

    Substrate

    Cement board or coated foam panel, set flat, seams taped and screwed to the schedule on the data sheet.

  4. 04

    Waterproofing

    Pre-slope, membrane, corners, curb and niche penetrations, then a 24 hour flood test with the water line marked.

  5. 05

    Layout

    Ledger lines, a centered field, and no cut narrower than a third of a tile at any corner or edge.

  6. 06

    Setting

    Mix the mortar in small batches and let it slake ten minutes, then set with the right notch, full coverage, and no lippage you can catch a fingernail on.

  7. 07

    Grout & seal

    Grout the field once the mortar cures, then silicone every change of plane instead of grouting it.

  8. 08

    Trim & cure

    Valve trim, drain grate, glass, and the full cure before the shower sees water or the grout sees sealer.

The parts nobody shows you

Plumbing, waterproofing, and joints.

Three details decide whether the shower is still sound in ten years. All three are cheaper to get right now than to reopen later.

A

Plumbing that has to be right first

Valve center 42–48" above finish floor, showerhead 78–84", drain centered on the tile field, and blocking behind every grab bar and glass panel. This is the one phase you cannot fix after tile.

B

Waterproofing as a system

Pre-slope at 1/4 inch per foot, pan corners, dam corners at the curb, fabric at every seam, and no fastener through the membrane below two inches above the curb.

C

Joints that move instead of crack

Grout is rigid. Every inside corner, curb-to-wall line, tub-to-wall line and floor perimeter gets 100% silicone, not grout. Grout thickness at least two thirds of the tile depth.

Numbers to know cold

The specs most tutorials leave out.

Keep these on your phone in the aisle. Almost every failed tile job traces back to one of them.

1/4"

Slope per foot

Pre-slope and final bed both run to the drain.

24 h

Flood test

Plug the drain, mark the level, check it the next day.

42–48"

Valve center

Above finished floor, not above the old pan.

1/32"

Max lippage

A fingernail should not catch across a joint.

80/95

Mortar coverage %

Dry areas versus wet areas, minimum.

L/360

Floor deflection

L/720 for natural stone floors.

1/8" in 10 ft

Floor flatness

Large format tile needs it flatter than 1/4 in 10.

10–15%

Tile overage

Cuts, breakage, and a spare box for later.

Finished jobs

Tiled it themselves.
Here is how it came out.

Each photo is a finished project, paired with the owner's own words about the part of the job that mattered most.

“I planned the wall before I bought a single box. Ordered to the number the layout studio gave me, and had four tiles left over instead of two boxes sitting in the garage.”
Marcy T. · Guest bath · Portland, OR
“I had already bought the wrong pan. The drain chapter caught it: my slope was running the wrong way, and I would have found out after grouting.”
Dave R. · Walk-in shower · Columbus, OH
“First time tiling anything. Working one phase at a time kept me from mixing mortar before the waterproofing was done, which is exactly the mistake I would have made.”
Priya N. · Bath floor · Austin, TX
Wet room · book-matched marble slab, brass linear drain
Curbless shower · micro-cement walls, matte porcelain pan
Bath floor · honed limestone, herringbone layout
Backsplash · glazed zellige, pale grout lines
Mudroom floor · matte terracotta porcelain, tight joints
Fireplace surround · honed soapstone, thin dark grout

Start with the layout.
Everything else follows it.

Decide where the cuts land, order to that number, and the waterproofing, plumbing and grout all have a fixed target to hit.